First, the composition of the financial industry data center:
The data center can be divided into five functional areas:
(1) Renovation of the engine room: including the four sub-environmental projects of the host room, office area, system monitoring center, and power.
(2) Air Conditioning: Dedicated air conditioning system, fresh air system, etc.
(3) Firefighting: gas firefighting, fire alarm, etc.
(4) Weak power system: comprehensive cabling of the engine room, environmental monitoring of the engine room, and KVM.
(5) Electrical systems: UPS, diesel generators, lightning protection, power distribution, and grounding.
Second, the selection of equipment (1) the choice of distribution frame: Select the modular distribution frame to flexibly configure the number of terminations, both to reduce port waste and facilitate future maintenance changes; the use of high-density distribution frame, improve the use of the cabinet Density to save space.
(2) Selection of jumpers: Colors are used to distinguish the jumpers of different networks; jumper performance indicators should meet the requirements of the corresponding standards; high-density copper cables and fiber jumpers are used to improve the plugging accuracy of high-density environments. And security.
(3) Selection of cables: selection criteria: long service life, minimized space occupation, better transmission capacity, safety flame retardancy, and multiple color discrimination;
Optional transmission media: Category 6A twisted-pair; multimode fiber optic cable; single-mode fiber optic cable.
(4) Selection of cabinets: Select open racks to install the wiring equipment; select Aipu-Huaton modular cabinets to install cabinet systems, power distribution systems, refrigeration systems, integrated wiring systems, and management systems, etc. It is convenient for later expansion; with modular UPS, UPS cabinets and power distribution cabinets are used as the top counters for strong power. Make UPS redundancy from N+1 to N+X; reserve enough cabling space, cable managers, power outlets, and power cords to ensure adequate airflow.
(5) The choice of cable manager: Flexible use of horizontal cable manager and vertical cable manager to realize the integration of the space in the cabinet or rack, improve the efficiency of cable management, and avoid the clutter of jumper management.
(6) Pre-connection system: A pre-connection system including a distribution frame, a module insertion box, and a pre-terminated copper cable and optical fiber cable assembly. Quickly connect system components to achieve plug-and-play operation of copper cables and optical cables, reduce the risk of change, save space, and make management and operation convenient and flexible.
The financial system's data center because of its preference for reliability and security, the choice of cabling products and solutions is usually of high specification and redundancy. However, different applications also require different types of cabling for support. This article only describes the general mode of equipment selection. Specific to a certain project also needs to be different according to the characteristics of its own application, different data centers also need to provide targeted More suitable for the features of its programs and products.
Third, on the love spectrum Wharton micro module data center:
Aipu Wattung Micro-Module Data Center adopts standardized components, supports prefabricated production, can be deployed quickly, saves more than 50% of the deployment time compared to traditional data centers, and has a short deployment cycle. The modular architecture facilitates the expansion of the occupied area. Small; highly integrated, easy to manage; less capacity idle, high operation and maintenance efficiency; green energy; visual DCIM management, easy to use smart; support flexible expansion, customizable production.
Financial industry data center construction: what should pay attention to equipment selection?
The financial system's data center because of its preference for reliability and security, the choice of cabling products and solutions is usually of high specification and redundancy. But different applications also require different types of cabling to support.