Nantong Weizhuo Environmental Protection Equipment Co.,Ltd , https://www.cwznts.comRecently, Veolia Group has completed the delivery of MPPE water treatment equipment to the Ichthys LNG FPSO project. The FPSO is currently being built in Daewoo, South Korea. This 450 ton modular unit removes all toxic compounds during the FPSO production process. The Ichthys LNG project plans to produce up to 8.9 million tons of LNG and 1.6 million tons of LPG per year, producing about 100,000 barrels of condensate per day at peak times. It is reported that the design and operation cycle of these two modular devices can reach 40 years.