Taizhou Oriental Hospital Project

Hospital Project (RMB 30 million in 2011-2012)
Project Name: Taizhou Dongfang Hospital Project Progress Stage: Environmental Impact Assessment Construction Period: 2011-2012 Major Equipment: Fire-fighting facilities, security facilities, water supply and drainage facilities, electrical facilities, ventilation facilities, lighting facilities, elevators, medical equipment, electronic display Screens, cranes.

Project Description:
The project is located at No. 386 Jichuan West Road, Hailing District, Taizhou. The south side is Jichuan West Road, the north side is Dongming Village, the west side is Jiesheng Junyuan, and the east side is an vacant housing site for dental hospitals. The project leases existing 5-storey buildings, and constructs locker rooms, canteens and other buildings. The total site area is 4,500 square meters. It consists of internal medicine, surgery, obstetrics and gynecology, otolaryngology and other departments. There are 20 beds and no infection. Section. The total investment of the project is 30 million yuan.

Construction Unit: Taizhou Oriental Hospital Co., Ltd. Postal address: 386 Jichuan West Road, Taizhou Postcode: 225300
Contact: Mr. You

Design institute: Taizhou Environmental Science Research Institute (EIA)
Postal address: 18 Yonghui Road, Taizhou Zip Code: 225300
Contact: Miss Fan Fax

Related Developments: Tower Crane Infrastructure Project

IBC Environmentally Friendly And Energy-saving High-speed Blow Molding Machine

IBC ton barrel blow molding machine,environmentally friendly high speed 110s each,high efficiency and energy saving blow molding machine

Weifang Yuyang plastic machinery co,.ltd, , https://www.yuyangmach.com