Hengshan County Jinxi Project Information Center Project

Hengshan County Jinxi Engineering Information Center Project (2012-2013, 0.6 billion)
Project Name: Jinshan Project Information Center, Changshan County, Hengzhou Project Progress: Engineering Design and Construction Period: 2012.3-2013.3
Major equipment: cranes, building materials, exterior wall decoration materials, glass doors and windows, sanitary ware, elevators, waterproof anti-corrosion materials, paint coatings, valve components, ceramic products, instrumentation, water supply and drainage systems, fire fighting systems, pipe fittings, water supply equipment, Outdoor drainage, building electrical, lighting fixtures, low-voltage electrical appliances, wire and cable, weak point systems, lightning protection systems, low-voltage distribution cabinets.
Project Profile: The project is located in Tianma Town, Changshan County, Hengzhou, Zhejiang Province, and is building an information center building with a total construction area of ​​14,500 square meters.

The total investment of the project is 60 million yuan

Construction Unit: Changshan County Finance Bureau, Hengzhou Postal address: 415 Dingyang North Road, Tianma Town, Hengshan County, Hengzhou, Zhejiang Zip Code: 324200
Contact: Zhan Hongliang Telephone

Related Developments: Tower Crane Infrastructure Project

Pre-insulated Pipe Fabrication

Pre-insulated, pre-fabricated jacketed piping system is used for industrial and commercial applications. Pre-Insulated, pre-jacketed thermal pipe has a definite advantage over field installed insulation and jacketing. All straight sections of the factory preinsulated piping system shall be jacketed with a High Density Polyethylene (HDPE) jacket conforming to ASTM D1248,PVC jackets shall not be allowed.

All field butt joints shall be made in straight sections of pipe.here for welding polyethylene, it can use field hdpe pipe Butt Fusion Machines according to pipe range. For PE Pre-insulated pipe fabrication, It will use workshop fitting machines for bend fabrication of plastics. How it works? Firstly you need to prepare pe pipe Angle Cutting Saw and fix thin pipe on sepcial clamp, and then cut hdpe pre-insulated pipe in required angle. Then move this pipe and fix them on elbow clamps of pre-insulated fitting welding equipment. Special half heating plates positioned on top of the welding zone are used to ensure the required welding temperature, The appication of uniform welding pressure which is controlled hydraulically, ensures the quality of the weld between the sleeve and the pipe casing. The welding phases of pipe fabrication are below: 1. Approaching and preheating 2: Heating 3.Removing the heating element 4. Reaching the welding pressure 5.Welding 6. Cooling


Pre-Insulated Pipe Fabrication,Custom Pipe Fabrication,Pipeline Fabrication,Butt Fusion Welding Machine

WUXI MEIERTE MACHINERY TECHNOLOGY CO.,LTD , https://www.wxpipefusionweldings.com